Журналы →  Gornyi Zhurnal →  2018 →  №1 →  Назад

PHYSICS OF ROCKS AND PROCESSES
Название Unloading of rockburst-hazardous interchamber pillars at active faults by blast energy
DOI 10.17580/gzh.2018.01.09
Автор Kutuzov B. N., Tyupin V. N.
Информация об авторе

Belgorod National Research University, Belgorod, Russia:

B. N. Kutuzov, Consultant Professor, Doctor of Engineering Sciences
V. N. Tyupin, Professor, Doctor of Engineering Sciences, tyupinvn@mail.ru

Реферат

The article informs on dynamic events due to rock pressure in mines of Priargun Mining and Chemical Association, and on their types. These dynamic events mostly take places in granite basal complex at a depth more than 500 m below ground surface. It is pointed at higher horizontal stresses induced by tectonics of the Indian and Eurasian Platforms. Antei granite deposit is cut by north-eastward orebearing faults into narrow north-eastward tectonic blocks. Dynamic events due to rock pressure occur most frequently when mining is carried out top-down, in blocks divided into two sublevels, with cemented backfill. The interchamber pillars less than 12–15 m high are rockburst-hazardous. Dynamic events take place in such pillars in the form of bumps. This study aims to develop safe and efficient method to unload interchamber pillars using blast energy. A blast influences stress state in fractured rock mass in three ways: relief of rocks near explosive charge and in-between the charge and exposure, loading in the direction from the charge into the depth of rock mass and initiation of dynamic events due to rock pressure in high-stress areas at the exposure. Physically, relaxation of rockburst-hazardous pillars at active faults by blasting consists in displacement of the foot wall of a fault relative to its hanging wall by means of short-delayed blasting. Concurrently, crumpling (squeezing) of rigid contacts at the fault edges takes place. The theoretical formulas to find blast hole spacing and delay intervals are proposed. The application of the method of rockburst-hazardous pillar unloading has proved its efficiency in terms of mine safety (22 pillars with a general area of 22 thou m2 relieved). With this method, the cost of rock mass relaxation by drilling-and-blasting is cut down.

Ключевые слова Dynamic events due to rock pressure, tectonic faults, jointing, rockburst-hazardous pillar, industry research, relief blasting, safety, efficiency
Библиографический список

1. Tyupin V. N. Development of explosive methods of stress reduction in bump hazard massifs. Gornyi Zhurnal. 1992. No. 12. pp. 27–29.
2. RD 06-329–99. Guidance for safe mining at ore and non-metallic deposits, objects of construction of rock-bump hazard and liable underground facilities. Iss. 1. Series 06. Regulatory documents for safety, supervisory and permitting activities in ore mining industry. Second edition. Moscow : NTTs po bezopasnosti v promyshlennosti Gosgortekhnadzora Rossii, 2003. 88 p.
3. Potapchuk M. I., Kursakin G. A., Sidlyar A. V. Improvement of safety of development of bump hazardous vein deposits of Eastern Primorye. Gornyi Zhurnal. 2013. No. 10. pp. 35–39.
4. Rylnikova M. V., Eremenko V. A., Esina E. N. Destressing of rockburst-hazardous and damaged zones. Gornyy informatsionno-analiticheskiy byulleten. 2014. No. 12. pp. 32–39.
5. Eremenko V. A., Gakhova L. N., Semenyakin E. N. Formation of higher stress zones and clusters of seismic events in deep mining in tashtagol. Fiziko-tekhnicheskie problemy razrabotki poleznykh iskopaemykh. 2012. No. 2. pp. 80–87.
6. Dordzhiev D. Yu. Selection of parameters camouflet blasting to reduce bump hazard by development uranium deposits. Zapiski Gornogo instituta. 2011. Vol. 189. pp. 210–213.
7. Bovt A. N., Nizamov A. Zh. Underground blast effect on environment. Moscow : NTTs “Rosvzryvobezopasnost”, 2010. 329 p.
8. Khachay O. A., Khachay O. Yu. Algorythm of rock burst preparation scenarium construction in rock massif under explosion influence using seismic catalogue data. Gornyy informatsionnoanaliticheskiy byulleten. 2014. No. 4. pp. 239–246.
9. Woodward K., Wesseloo J. Observed spatial and temporal behaviour of seismic rock mass response to blasting. Journal of the Southern African Institute of Mining and Metallurgy. 2015. Vol. 115, Iss. 11. pp. 1045–1056.
10. Aksenov A. A., Ozhiganov I. A., Isyanov O. A. Application of acoustic emission method to rockburst hazard forecasting. Gornyi Zhurnal. 2014. No. 9. pp. 82–84.
11. Furtney J. K., Sellers E., Onederra I. Simple models for the complex process of rock blasting. Rock Fragmentation by Blasting: Fragblast 10. Leiden : CRC Press, 2013. pp. 275–282.
12. Shabarov A. N., Tsirel S. V., Morozov K. V., Rasskazov I. Yu. Concept of integrated geodynamic monitoring in underground mining. Gornyi Zhurnal. 2017. No. 9. pp. 59–64. DOI: 10.17580/gzh.2017.09.11
13. Shabarov A. N., Tsirel S. V. Geodynamic safety in underground mining. Gornyi Zhurnal. 2017. No. 9. pp. 65–70. DOI: 10.17580/gzh.2017.09.12
14. Rohrbach E., Liu L., Wang L. Variations in seismic velocity and attenuation associated with seismogenesis: A numerical verification using ambient noise. Tectonophysics. 2013. Vol. 584. pp. 54–63.
15. Wesseloo J., Woodward K., Pereira J. Grid-based analysis of seismic data. The Journal of The Southern African Institute of Mining and Metallurgy. 2014. Vol. 114. pp. 815–822.
16. Xiao Y.-X., Feng X.-T., Hudson J. A., Chen B.-R., Feng G.-L. et al. ISRM Suggested Method for In Situ Microseismic Monitoring of the Fracturing Process in Rock Masses. Rock Mechanics and Rock Engineering. 2016. Vol. 49, Iss. 1. pp. 343–369.

Language of full-text русский
Полный текст статьи Получить
Назад