Журналы →
Gornyi Zhurnal →
2010 →
№8 →
Назад
Назад
DEVELOPMENT OF THE STAROBIN DEPOSIT | |
Название | Technological schemes for the potash seams mining with partial stowing of the mined out area in order to avoid the dynamic phenomena |
Автор | Golovaty I. I., Shpakovski V. N., Tarakanov V. N., Prushak V. Y., Petrovski B. I. |
Реферат | Given the description of the conducted researches, as well as the developed and partially tested technological schemes (protected by the Republic of Belarus patents) of the potash strata selective mining by the long walls, including the elongated ones, which have the increased backfill rate of the mined out area with the stowing material and its compacting. The proposed technologies allow to minimize or exclude the dangerous dynamic phenomena while mining the Starobin deposit at big depths. |
Ключевые слова | Stratum selective mining by seams and the complete thickness mining, long walls, mined out area backfill, rock stripes, stowing complex, artificially yielding pillars, dynamic phenomena |
Language of full-text | русский |
Полный текст статьи | Получить |