Журналы →  Eurasian Mining →  2005 →  №2 →  Назад

Название Assessment of Efficiency of Rock Ore Relieving by Means of Large-size Wells
Автор A. A. Filinkov, D. V. Sidorov, A. E. Bodrov, A. N. Lamzin, V. I. Urusov
Информация об авторе

A. A. Filinkov, Head of Norilsk Department, Cand. Sci. (Techn.), D. V. Sidorov, Leading Research Assistant, Cand. Sci. (Techn.), A. E. Bodrov, Leading Engineer, (VNIMI); A. N. Lamzin, Director of “Norilsk-1” Ore Department, Cand. Sci. (Techn.), V. I. Urusov, Deputy Chief Engineer of the Miningand Geology Department for Mining Works, (Zapolyarnyi Department of “GMK “Norilsk Nickel” JSC)

Библиографический список

1. Instructions on safe implementation of mining operations at Talnakh and Oktyabrsky deposits prone to rock bumps and assessed as hazardous. — Norilsk, 2001.
2. TI 44577806.14.135-25-2000. “The use of slicing method with the packing of goaf with consolidating materials and location of stope ores in protected areas at excavation of sulfide ores at the mines of “Norilskaya gornaya kompaniya” JSC. — 2000.
3. Report of Research “Scientific support and correction of current engineering solutions on safe and efficient mining of highgrade ores in SM–1 to a full settlement” (contract No. DN-189-03). Stage 1.3. To assess the efficiency and change of SM–1 stress state in drilling large-diameter wells. — St. Petersburg: VNIMI, 2004.

Language of full-text английский
Полный текст статьи Получить
Назад