Название | First stage of mastering of Grib deposit: preparatory and capital mining operations |
Автор | Zaostrovtsev V. N., Yaparov Ya. A., Klimenko Yu. A., Nalivayko V. A. |
Информация об авторе | Arkhangelskgeoldobycha: Zaostrovtsev V. N., Deputy general director — Chief Engineer (since 15 December 2008 till 30 June 2014), e-mail: VZaostrovtsev@agd.lukoil.com Yaparov Ya. A., Head of Production and Technical Department, e-mail: Yaparov@agd.lukoil.com Klimenko Yu. A., Mining Engineer, e-mail: YKlimenko@agd.lukoil.com Nalivayko V. A., Chief Project Engineer, e-mail: vnalivayko@giproruda.ru |
Реферат | The article describes the scheme of the deposit opening as well as the structure, technology and equipment of stone drivages aimed at removal of thick overburden layer as the first stage of the diamond deposit development at commercial level. |
Ключевые слова | diamond deposit, open-pit mine, ore body, overburden rock, opening-up, preparatory work |