Журналы →  Gornyi Zhurnal →  2020 →  №12 →  Назад

ECONOMY, ORGANIZATION AND MANAGEMENT
Название Assessment of computational accuracy of minimum commercial value for gold placers
DOI 10.17580/gzh.2020.12.09
Автор Batugina N. S., Tkach S. M., Khoyutanov E. A.
Информация об авторе

Chersky Institute of Mining of the North, Siberian Branch, Russian Academy of Sciences, Yakutsk, Russia:

N. S. Batugina, Leading Researcher, Doctor of Economic Sciences, batuginan@mail.ru
S. M. Tkach, Chief Researcher, Doctor of Engineering Sciences
E. A. Khoyutanov, Researcher, Candidate of Engineering Sciences

Реферат

Economic indices of mineral mining meet conditions of finitude, single-valuedness, continuity and smoothness as any geological characteristic of the subsoil. Referring an economic index and unit volume needs that a rock mass is considered as a set of elementary volumes, and each elementary volume has peculiar quality and quantity of minerals, occurrence conditions, physical and mechanical properties, etc. In case of any specific mining technology, each elementary volume has cost/performance ratios of end product making–extraction, expenses and profit. The choice of mining technology and equipment is governed by the structure, quantity and quality of mineral reserves; thus, the economic structure efficiency should be evaluated for each specific mine and for each specific geotechnology. In the course of continuous improvement of mining technologies and equipment, the geological and economic structures of deposits, as well as their integral characteristics change. Acquisition of accurate economic indices needs estimation of major factors of influence on the cost of mining. More precise evaluation of profit requires complete data on a deposit by the time of mine planning and design, and this is only possible subject to improved geological backup of mining operations. This case-study of gold placers is an attempt to try to determine the mechanism and features of influence exerted by geological factors and process solutions on the efficiency of use of georesources via assessment and control of errors of the resources and profit return in mining and processing.

Ключевые слова Mineral resources, assessment, error, minimum commercial value, cut-off grade, expenses, efficiency, geometrization of mineral deposits
Библиографический список

1. Githiria J., Musingwini C. A stochastic cut-off grade optimization model to incorporate uncertainty for improved project value. Journal of the Southern African Institute of Mining and Metallurgy. 2019. Vol. 119, No. 3. pp. 217–228.
2. Ziad Saliba, Dimitrakopoulos R. Simultaneous stochastic optimization of an open pit gold mining complex with supply and market uncertainty. Mining Technology: Transactions of the Institutions of Mining and Metallurgy. 2019. Vol. 128, Iss. 4. pp. 216–229.
3. Minniakhmetov I., Dimitrakopoulos R. Joint High-Order Simulation of Spatially Correlated Variables Using High-Order Spatial Statistics. Mathematical Geosciences. 2016. Vol. 49, No. 1. pp. 39–66.
4. Asad M. W. A., Qureshi M. A., Jang H. A review of cut-off grade policy models for open pit mining operations. Resources Policy. 2016. Vol. 49. p p. 142–152.
5. Kopytov A. I., Rogova T. B., Shaklein S. V. Evaluation of expected errors in geometrization of coal deposits at the stage of exploration and operation. Gornyi Zhurnal. 2020. No. 4. pp. 4–9. DOI: 10.17580/gzh.2020.04.01
6. Makarcheva A. A., Kushnarev P. I. Features of quality standard justification in evaluation of thin gold lode deposits. Nedropolzovanie XXI vek. 2020. No. 1(83). pp. 100–107.
7. Batugina N. S., Gavrilov V. L., Tkach S. M. Error in calculation of profits in mining complex-structure deposits. Gornyi Zhurnal. 2018. No. 12. pp. 26–30. DOI: 10.17580/gzh.2018.12.06
8. Muzafarov A. M., Oslopovskiy S. A., Sattarov G. S. Radiometri c investigations of technogenic objects. Tsvetnye Metally. 2016. No. 2. pp. 15–19. DOI: 10.17580/tsm.2016.02.02
9. Belykh V. V. A mathematical model of company revenue amid demand uncertainty. Ekonomika i matematicheskie metody. 2020. Vol. 56, No. 1. pp. 100–113.
10. Gilani S.-O., Sattarvand J. Integrating geological uncertainty in long-term open pit mine production planning by ant colony o ptimization. Computers & Geosciences. 2016. Vol. 87. pp. 31–40.
11. Ajak A. D., Lilford E., Topal E. Application of predictive data mining to create mine plan flexibi lity in the face of geological uncertainty. Resources Policy. 2018. Vol. 55. pp. 62–79.
12. Batugina N. S., Gavrilov V. L., Tkach S. M., Gavrilov V. I. Cluster structure of placers in Yakutia and the use of this feature in geotechnologies. Gornyi Zhurnal. 2019. No. 2. pp. 17–20. DOI: 10.17580/gzh.2019.02.03

Language of full-text русский
Полный текст статьи Получить
Назад