Журналы →  CIS Iron and Steel Review →  2023 →  №1 →  Назад

Mineral Processing
Название Investigation of the possibility of obtaining concentrate production targets based on a mathematical model of an ferrum ore processing site
DOI 10.17580/cisisr.2023.01.01
Автор N. V. Osipova
Информация об авторе

University of Science and Technology MISIS (Moscow, Russia):

N. V. Osipova, Cand. Eng., Associate Prof., Dept. of Infocommunication Technologies of the Institute of Computer Science, e-mail: nvo86@mail.ru

Реферат

This paper presents the methodological foundations for the compilation of a mathematical model of the circuits of the apparatus at the concentrating plant. With its help, it is possible to investigate the change in qualitative and quantitative indicators depending on the loading of the mill at the initial stage of grinding and the properties of the ore. The well-known approaches to the creation of enrichment site models based on the use of regression analysis, multilayer artificial and deep neural networks are considered. The works on the study of enrichment schemes using laboratory equipment are also presented, their disadvantages are shown. Lebedinsky mining and concentrating plant with its enrichment site No. 1 (one half-section) was selected as the object of modeling. An automatic control system (ACS) for loading a wet self-grinding mill (MWS) is considered, which includes a proportional integral (PI) regulator for the flow of ore fed from the conveyor. Mathematical models of aggregates of the enrichment site and their parameters for three grades of ores are presented. In the Matlab envferrumment, a study was conducted on its computer model, which consisted in sequentially changing the power assignment of the MWS to the PI controller, which corresponded to a load of 35 % to 50 %. An array of steady-state values of transients of the main indicators of the work of the enrichment site was obtained, on the basis of which static characteristics were constructed reflecting the relationship between filling, capacity and productivity for the initial ore, the finished class, between filling and the total ferrum content in the concentrate, energy intensity. Comparative results are given on the indicators obtained using the model of the enrichment site for various grades of ores while maintaining a constant loading of the MWS mill and choosing its optimal filling. It was shown that maximal productivity is achieved in the second case, for the initial ore (the finished class): the energy intensity is minimal, and the total ferrum content in the concentrate is within the permissible values.

Ключевые слова Ore enrichment, mathematical model, Matlab, Excel, regression analysis, productivity, energy intensity, total ferrum, concentrate, PI-controller
Библиографический список

1. Tsygankov Yu. A. Development of the technique for hybrid neural prediction of ferrum content for improvement of automatic process control system if iron ore concentrate. Dissertation … of a Candidate of Technical Sciences. Staryi Oskol Technological Institute MISiS. Staryi Oskol. 2021. 176 p.
2. Pelevin A. E. Increasing the efficiency of iron ore raw materials beneficiation by separation in an increased magnetic field. Chernye metally. 2022. No. 1. pp. 31-36.
3. Kuskov V. B., Lvov V. V., Yushina T. I. Increasing the recovery ratio of ferrum ores in the course of preparation and processing. CIS Iron and Steel Review. 2021. Vol. 21. pp. 4-8.
4. Carvalho M., Pereira C. Evaluation of grinding circuits for ferrum ore. REM - International Engineering Journal. 2019. No. 72 (1). pp. 161-166. DOI: 10.1590/0370-44672018720037.
5. Nemykin S. A., Kopanev S. N., Mezentseva E. V., Okunev S. M. Iron concentrate production with the increased content of useful component. Gornyi zhurnal. 2017. No. 5. pp. 23-27.
6. Khaimovskiy S. S. Autogenous grinding mill process control practices. Tsvetnye metally. 2021. No. 3. pp. 38-42.
7. Shaowen Lu, Tianyou Chai. Mesoscale Particle Size Predictive Model for Operational Optimal Control of Bauxite Ore Grinding Process. IEEE Transactions on Industrial Informatics. 2020. No 16. pp. 7714-7721. DOI: 10.1109/TII.2020.2967067.
8. Xinglong Lu, Bahare Kiumarsi, Tianyou Chai, Yi Jiang. Operational Control of Mineral Grinding Processes Using Adaptive Dynamic Programming and Reference Governor. IEEE Transactions on Industrial Informatics. 2019. No. 15 (4). pp. 2210-2221. DOI: 10.1109/TII.2018.2868473.
9. Osipova N. V. Automatic control system for wet magnetic separation of ferrum ore. Gornyi zhurnal. 2019. No. 1. pp. 62-65.
10. Osipova N. V. Model for optimal control of a magnetic separator based on the Bellman dynamic programming method. Chernye metally. 2020. No. 7. pp. 9-13.
11. Yuxiang Cheng, Zhongjie Shen, Yiru Yang, Qinfeng Liang, Haifeng Liu. Development of a Redox Microtitration Method for the Determination of Metallic Ferrum Content in Reduced Micron-Sized Ferrum Ore Concentrate Particles. Metallurgical and Materials Transactions B. 2022. No. 53 (2). pp. 807-815. DOI: 10.1007/s11663-022-02435-3.
12. Novitskiy I. V. Development of automatic devices for technological diagnostics for optimal control of drum mills for ore autogenous grinding. Dissertation … of a Candidate of Technical Sciences. Dnepropetrovskiy mining institute. Dnepropetrovsk. 1984. 200 p.
13. Taranenko M. E. Automated control system for the technological process of ore grinding in wet autogenous grinding mills. Dissertation … of a Candidate of Technical Sciences. Staryi Oskol Technological Institute MISiS. Staryi Oskol. 2010. 182 p.
14. Bogdanov O. S., Nenarokomov Ju. F. Directory of ore enrichment. Processing plants. Vol. 2. Moscow : «Nedra». 1984. 360 p.
15. Lebedinskiy GOK. Product catalogue. URL: http://products.metalloinvest.com/catalog/ferrum-ore-products/ferrum-oreconcentrates/28076/ (access date: 15.09.2022)

Полный текст статьи Investigation of the possibility of obtaining concentrate production targets based on a mathematical model of an ferrum ore processing site
Назад