Название Multivariate approach to justification a rational payback period for an investment project of an electric steelmaking shop
DOI 10.17580/chm.2023.08.13
Автор E. V. Ivanova, N. V. Martyushev, A. I. Musatova, V. V. Kukartsev, A. I. Karlina
Информация об авторе

Siberian State Industrial University, Novokuznetsk, Russia:

E. V. Ivanova, Cand. Econ., Associate Prof., Head of the Dept. of Management and Sectoral Economics, e-mail: ivanovaev75@mail.ru

A. I. Musatova, Lecturer, Institute of Additional Education, e-mail: musatova-ia@yandex.ru

 

Tomsk Polytechnic University, Tomsk, Russia:
N. V. Martyushev, Cand. Eng., Associate Prof., Dept. of Materials Science, e-mail: martjushev@tpu.ru

 

Siberian Federal University, Krasnoyarsk, Russia1 ; Reshetnev Siberian State University of Science and Technology, Krasnoyarsk, Russia2 ; Bauman Moscow State Technical University, Moscow, Russia3:

V. V. Kukartsev, Cand. Eng., Associate Prof.1,2, Researcher3, e-mail: vvkukartsev@sfu-kras.ru

 

Moscow State University of Civil Engineering, Moscow, Russia:
A. I. Karlina, Cand. Eng., Researcher, e-mail: karlinat@mail.ru

Реферат

Mathematical models of multivariate payback periods for a metallurgical investment project have been developed, allowing for a phased situational simulation of the accumulation of expected income directed to reinvestment. Currently, a variety of methods for evaluating the effectiveness of projects are used, the choice of which depends on the scale and duration of its implementation, on the volume of investments, on the type of financial stability of the enterprise. The proposed multivariate approach to evaluating the effectiveness of the project, considered on a specific example of the reconstruction of the electric steel-smelting shop. Three types of structured mathematical models for calculating the effectiveness of an investment project are given. Many models 1 as basic options assume that initially cash flows after the reconstruction of modernization will flow evenly over time intervals (years, quarters or months). Model 2 is planned taking into account the uneven receipt of components of cash income. So, at the first stages of time, it is planned to reduce net profit, and then increase it compared to the initial values. The total depreciation deductions from the introduction of capital investments by stages will decrease. Model 3 is a development of models 2, and is determined by complex (dynamic) methods, where the effectiveness of the investment project is evaluated taking into account the discounting of income. The algorithmic support of the decision support system on the timing of the effectiveness of a metallurgical investment project is presented. The generated models for calculating the effectiveness of the project are presented in the form of special tables that correspond to the step-by-step procedure for determining situational options provided to the customer of the project to select a rational option for the payback period when it is implemented in the electric steelmaking shop of EVRAZ ZSMK JSC.

Ключевые слова Valuation, efficiency, investments, models, profit, multivariance, depreciation, static and dynamic methods, discounting
Библиографический список

1. Ivanova E. V. On the problems of activation of investment activity in the Kemerovo region. Actual challenges of economics and management in the XXI century. Collection of scientific articles of the VII International Scientific and Practical Conference. Novokuznetsk. 2021. pp. 145–149.
2. Prokhorova E. K. The influence of the fixed assets state on the development of Russian industry in the context of international sanctions. Vestnik Mezhdunarodnogo instituta rynka. 2019. No. 1. pp. 30–36.
3. Bobrova N. M., Bryazgunova K. A., Plyusnina L. M. Financial and economic justification for the effectiveness of an investment project for technical re-equipment of production. Innovatsionnoe razvitie ekonomiki: tendentsii i perspektivy. 2022. Vol. 1. pp. 164–173.
4. Karanfil D. Kh., Androshina I. S. Evaluation of the effectiveness of an investment project. Vektor ekonomiki. 2022. No. 5 (71). DOI: 10.51691/2500-3666_2022_5_8.
5. Abdykerova G. Zh. Systematic approach to the analysis of the effectiveness of investment projects. Aktualnye problemy gumanitarnykh i estestvennykh nauk. 2017. No. 2-4. pp. 6–11.
6. Rakhlina E. R. Review of methods for evaluating the effectiveness of investment projects. Aktualnye problemy gumanitarnykh i estestvennykh nauk. 2015. No. 6–1. pp. 213–220.
7. Kochetkova A. V. Classification of mathematical methods and indicators for evaluating the effectiveness of investment projects. International Journal of Advanced Studies in Computer Engineering. 2021. No. 1. pp. 12–16.
8. Galiullina G. F., Sitdikov B. I., Grib V. N. Investment projects for import substitution and methods for evaluating their effectiveness. Vestnik Altayskoy akademii ekonomiki i prava. 2022. No. 11-1. pp. 39–44.
9. Vasiltsov V. S., Nysh M. S., Solovieva A. V. Management of the development of a metallurgical company on the basis of the algorithm of the pre-investment analysis. Chernye Metally. 2023. No. 1. pp. 80–85.
10. Patrick M., French N. The internal rate of return (IRR): projections, benchmarks and pitfalls. Journal of Property Investment & Finance. 2016. Vol. 34, Iss. 6. pp. 664–669. DOI: 10.1108/JPIF-07-2016-0059
11. Tabei S. M. A., Bagherpour M., Mahmoudi A. Application of fuzzy modelling to predict construction projects cash flow. Periodica Polytechnica Civil Engineering. 2019. Vol. 63. Iss. 2. pp. 647–659. DOI: 10.3311/PPci.13402
12. Jin Z., Kim J., Hyun C., Han S. Development of a model for predicting probabilistic life-cycle cost for the early stage of public-office construction. Sustainability. 2019. Vol. 11, Iss. 14. 3828. DOI: 10.3390/Su11143828
13. Amusan L. M., Afolabi A., Ojelabi R., Omuh I., Okagbue H. I. Data exploration on factors that influences construction cost and time performance on construction project. Data in Brief. 2018. Vol. 17. pp. 1320–1325. DOI: 10.1016/j.dib.2018.02.035
14. Tavakolan M., Nikoukar S. Developing an optimization financing cost-scheduling trade-off model in construction project. International Journal of Construction Management. 2022. Vol. 22, Iss. 2. pp. 262–277. DOI: 10.1080/15623599.2019.1619439
15. Gelrud Ya. D., Kibalov E. B. Large-scale investment projects: the problem of group expert evaluation of comparative efficiency. Vestnik Yuznho-Uralskogo gosudarstvennogo universiteta. Seriya: Ekonomika i menedzhment. 2020. Vol. 14. No. 1. pp. 71–79.
16. Galevsky S. G. Evaluation of the effectiveness of metallurgical investment projects based on correct risk assessment. Vestnik gorno-metallurgicheskoy sektsii Rossiyskoy akademii estestvennykh nauk. Otdelenie metallurgii. 2020. No. 43. pp. 216–225.
17. Bruner R., Li W., Kritzman M., Myrgren S., Page S. Market integration in developed and emerging markets: evidance from the CAPM. Emerging Markets Review. 2008. Vol. 9, Iss. 2. pp. 89–103. DOI: 10.1016/j.ememar.2008.02.002
18. Martyushev N. V., Kulakov S. M., Musatova A. I., Karlina A. I. Situational optimization of the work of the thermal department, taking into account the ordering instability. Chernye Metally. 2022. No. 7. pp. 58–63.
19. Fastykovsky A. R., Musatova A. I., Kulakov S. M., Martyushev N. V., Karlina A. I. Development of situation models for uration of production cycles of manufacturing finished rolled products. Message 1. Chernye Metally. 2023. No. 1. pp. 44–51.
20. Gizatulin R. A., Musatova A. I., Martyushev N. V., Valuev D. V., Karlina A. I. Development and application of normative timing models for the modernization of an electric steel-smelting shop. Chernye Metally. 2022. No. 4. pp. 10–16.

Language of full-text русский
Полный текст статьи Получить
Назад