FROM THE OPERATIONAL EXPERIENCE OF THE MINING COMPANIES AND THE ORGANIZATION
DEPARTMENT OF MECHANICS OF MATERIALS AND GEOTECHNOLOGY, TULA STATE UNIVERSITY
Название
Innovations in mining and underground construction from the Skuratovsky Experimental Plant
DOI
10.17580/gzh.2026.10.04
Автор
Averin E. A.
Информация об авторе

Skuratovsky Experimental Plant (Tula, Russia)

E. A. Averin, Head of Projects, Doctor of Engineering Sciences, evgeniy.averin.90@mail.ru

Реферат

The article describes the activities of the Skuratovsky Experimental Plant (SOEZ) as an enterprise that has been actively introducing innovations in mining and underground construction throughout its history. It provides a brief historical overview of the SOEZ. Founded in 1955 and reorganized as a private enterprise in the 1990s, SOEZ retained its scientific and production potential. The article also represents modern high-tech developments, their main technical characteristics, and application experience. Among modern achievements, focus is on the KTPM-5.6 tunnel boring machine – the first post-Soviet domestic shield tunneling complex with electro-hydraulic drives, automated navigation, and telemetry. Designed for deep metro construction in Saint Petersburg, it could be disassembled into small units for underground assembly. Its upgraded version, KTPM-5.63, was manufactured by the Obukhovsky Plant with SOEZ's assistance. The article describes mechanized shaft-sinking equipment, including ASP and SPKV-series shaft sinking machines. Operational data showed that mechanized sinking increases penetration rates by 1.25–2 times over drill-and-blast methods, reduces timelines by 20–25%, and cuts consumption of concrete for lining by up to 25%. It shows some scientific results obtained from the analysis of the SOEZ equipment's operation, and it notes the role of the faculty of Tula State University in their acquisition as well. As a conclusion the article indicates the direction of enterprise development on the example of the shaft sinking machine for hard rocks SKT.

Ключевые слова
Skuratov Experimental Plant, mining machine, shaft sinking machine, shield tunneling machine, mining, underground construction
Библиографический список

1. Antipov V. V. SOEZ: Yesterday, Today, Tomorrow. Gornoe oborudovanie i elektromekhanika. 2012. No. 4. pp. 2–5.
2. Antipov Yu. V. The Review of Skuratov Experimental Plant the Serial Equipment. Gornoe oborudovanie i elektromekhanika. 2012. No. 4. pp. 6–18.
3. Chen K., Jiao S., Wang J. TBM Design and Construction. Singapore : Springer, 2023. 854 p.
4. Zhabin A. B., Polyakov An. V., Polyakov Al. V., Fomichev A. D., Antipov Yu. V. Calculation of a Rotory Executive Body for Tunneling Complex KTPM-6.0. Gornoe oborudovanie i elektromekhanika. 2012. No. 2. pp. 16–23.
5. Zhabin A. B., Polyakov An. V., Polyakov Al. V., Fomichev A. D., Antipov Yu. V. Calculation of a Rotory Executive Body for Tunneling Complex KTPM-6,0. Gornoe oborudovanie i elekromekhanika. 2012. No. 4. pp. 26–32.
6. Tumac D., Balci C. Investigations into the cutting characteristics of CCS type disc cutters and the comparison between experimental, theoretical and empirical force estimations. Tunnelling and Underground Space Technology. 2015. Vol. 45. pp. 84–98.
7. Levankovsky I. A. Scientific framework of engineering high-efficiency cutting tools for rrocks and rock-bearing composites : Dissertation of Doctor of Engineering Sciences. Moscow, 1999. 335 p.
8. Zhabin A. B., Polyakov A. V., Averin E. A. Comparison of methods to calculate forces on frontal disc cutters in rock breaking process in Russia and abroad. Gornyi Zhurnal. 2018. No. 12. pp. 65–68.
9. Zhabin A. B., Polyakov A. V., Averin E. A., Linnik Yu. N. Design basis for tunnel boring machine cutter heads. MIAB. 2019. No. 6. pp. 156–164.
10. Rutkowski W. Methods, developments and inspections in mine shaft sinking – a review. International Journal of Mining and Mineral Engineering. 2025. Vol. 16, No. 1. pp. 21–60.
11. Zhabin A. B., Polyakov A. V., Fomichev A. D. Auger-Milling Actuator of Barrel Deepening ASP-8,0 Computing. Gornoe oborudovanie i elektromekhanika. 2014. No. 3. pp. 3–8.
12. Zhabin A. B., Fomichev A. D. Defining Performance of Auger-Milling Executive Shaft Sinking Assembly ASP-8,0 for immersion work mode. Gornoe oborudovanie i elektromekhanika. 2014. No. 8. pp. 7–12.
13. Zhabin A. B., Fomichev A. D. Some Research Results in the Operation Barrel Deepening ASP-8,0. Gornoe oborudovanie i elektromekhanika. 2014. No. 7. pp. 8–11.
14. Zhabin A. B., Fomichev A. D., Naumov Ju. N., Solovyh D. Ja. Results of studies of shaft boring machine operation in vertical shaft construction at Upper Kama Potash Deposit. Eurasian Mining. 2016. No. 1. pp. 29–32.
15. Maidl B., Schmid L., Ritz W., Herrenknecht M. Hardrock Tunnel Boring Machines. Berlin : Ernst & Sohn, 2012. 356 p.
16. Averin E. A., Zhabin A. B., Polyakov A. V., Linnik Yu. N., Linnik V. Yu. Transition between relieved and unrelieved modes when cutting rocks with conical picks. Journal of Mining Institute. 2021. Vol. 249. pp. 329–333.
17. Averin E. A., Zhabin A. B., Polyakov A. V., Linnik Yu. N., Linnik V. Yu. Conical Pick Failure Effect on Rock Cutting Process Conditions. Journal of Mining Science. 2021. Vol. 57, No. 5. pp. 812–820.
18. Sheveleva O. B, Zonova O. V., Slesarenko E. V. Perspective trends in the formation of human resources potential of the mining industry. Tekhnika i tekhnologiya gornogo dela. 2024. No. 3(26). pp. 62–78.
19. Abenov T., Franklin-Hensler M., Grabbert T., Larrat T. Has mining lost its luster? Why talent is moving elsewhere and how to bring them back. McKinsey & Company, 2023. 10 p.

Language of full-text