Название The estimation of efficiency of using electronic detonators during formation contour chinks in quarries
Автор Melik-Gajkazov I. V., Togunov M. B., Shitov Yu. A., Fokin V. A.
Информация об авторе Melik-Gajkazov I. V., Technical Director, Candidate of Engineering Sciences, e-mail: Igor.Melik-Gaikazov@eurochem.ru; Togunov M. B., Chief Expert of Drilling and Blasting Operations, Engineering Development Department, e-mail: Mikhail.Togunov@eurochem.ru; Shitov Yu. A., Deputy Chief Engineer of "Zheleznyi" Pit, e-mail: Yuri.Shitov@eurochem.ru, "Kovdorskiy Mining and Concentrating Plant" Company; Fokin V. A., Leading Researcher, Doctor of Engineering Sciences, e-mail: fva666@goi.kolasc.net.ru, Mining Institute of Kola Scientific Centre of the Russian academy of Sciences.
Реферат
The results of pilot-researching works of estimation of quality of bank slope work of rock binary ledge with 24 m highness with preliminary chink formation by the way of explosion of contour blasthole charges with their initialization by electronic detonators of I-konTM system and Eksel non-electrical system have been presented. These results were realized at Kovdorskiy mining and concentration plant. Deficiency of  important advantages of electronic detonators in quarry conditions has been established.
Ключевые слова Bank slope work, preliminary chink formation, contour blasthole charge, initialization facilities, electronic detonators, complex criteria of quality of bank slope work.