CONSTRUCTION OF NEW AND RECONSTRUCTION OF EXISTING PROCESSING PLANTS | |
ArticleName | Increasing of the production volumes on the processing plant of Zangezur Copper Molybdenum Combine |
ArticleAuthor | Akopyan M. A., Markaryan A. V., Bezirganyan K. V., Arustamyan M. A., Arustamyan A. M. |
ArticleAuthorData | Zangezur Copper Molybdenum Combine, Kajaran, Republic of Armenia: Akopyan M. A., Chief Executive Officer, Markaryan A. V., Technical Officer, Candidate of Engineering Sciences, Bezirganyan K. V., Head of the Processing Plant,
Science and Production Association “RIVS” JSC, Saint Petersburg, Russia: Arustamyan M. A., Technical Officer, Candidate of Engineering Sciences, Arustamyan A. M., Deputy Chief Engineer of a Project, |
Abstract | In the recent years, Zangezur Copper Molybdenum Combine (Zangezur CMC) have been successfully realizing the construction projects and modernization of all production areas of the processing plant, by the increasing of output and its quality, and the decreasing of operating costs. Science and Production Association “RIVS” is the chief contractor of the construction and modernization of the processing plant. It also acts as the chief designer and equipment supplier, which realizes the supervision, balancing, commissioning, and organization of construction. The first construction stage of the processing plant had been realized since 2004 till 2010. The processing capacity increased from 8.2 to 13.5 mln. t of ore per year. Meanwhile, the technological concentration values of copper and molybdenum were improved. In 2011, there was signed a contract for the processing plant expansion with bringing its ore throughput to 20–25 mln. t. The contract covers all operations of the technological concentration chain. Due to this contract, the following operations are foreseen: |
keywords | Zangezur Copper Molybdenum Combine, processing plant, reconstruction, flotation, ore preparation building, semi self crushing, technological values |
References | 1. Akopyan M. A., Markaryan A. V., Bezirganyan K. V. et al. Pervye rezultaty tekhnicheskogo perevooruzheniya Kadzharanskoy obogatitelnoy fabriki Zangezurskogo MMK (Armeniya) (First results of the technical re-equipment of Kajaran processing plant of Zangezur CMC (Republic of Armenia)). Gornyi Zhurnal — Mining Journal, 2008, Special issue, pp. 88–91. |
Language of full-text | english |