ArticleName First stage of mastering of Grib deposit: preparatory and capital mining operations
ArticleAuthor Zaostrovtsev V. N., Yaparov Ya. A., Klimenko Yu. A., Nalivayko V. A.
ArticleAuthorData

Arkhangelskgeoldobycha:

Zaostrovtsev V. N., Deputy general director — Chief Engineer (since 15 December 2008 till 30 June 2014), e-mail: VZaostrovtsev@agd.lukoil.com

Yaparov Ya. A., Head of Production and Technical Department, e-mail: Yaparov@agd.lukoil.com

Klimenko Yu. A., Mining Engineer, e-mail: YKlimenko@agd.lukoil.com

Nalivayko V. A., Chief Project Engineer, e-mail: vnalivayko@giproruda.ru

Abstract

The article describes the scheme of the deposit opening as well as the structure, technology and equipment of stone drivages aimed at removal of thick overburden layer as the first stage of the diamond deposit development at commercial level.

keywords diamond deposit, open-pit mine, ore body, overburden rock, opening-up, preparatory work
Language of full-text english