Journals →  Gornyi Zhurnal →  2017 →  #2 →  Back

DEVELOPMENT OF DEPOSITS
ArticleName Adjustment of backfill composition for mineral mining under open pit bottom
DOI 10.17580/gzh.2017.02.10
ArticleAuthor Bitimbaev M. Zh., Krupnik L. A., Aben Kh. Kh., Aben E. Kh.
ArticleAuthorData

Datamining, Almaty, Kazakhstan:

M. Zh. Bitimbaev, Member of the Board, Doctor of Engineering Sciences

 

Satpaev Kazakh National Research Technical University, Almaty, Kazakhstan
L. A. Krupnik, Professor, Doctor of Engineering Sciences
E. Kh. Aben, Senior Lecturer, Candidate of Engineering Sciences

GeoMineProject, Almaty, Kazakhstan:

Kh. Kh. Aben, Commercial Director, abencl@mail.ru

Abstract

Numerous deposits have already reached final stages of mining. As the depth of mining increases, many mineral deposits developed with the hybrid method are faced with the problem of searching for an efficient technology to extract open pit bottom reserves at the required completeness and safety. The authors consider Maikain complex deposit mining with the hybrid method. The previous project assumed extraction of open pit bottom reserves using various systems without backfilling. For this reason, extraction of crown pillars resulted in high loss and dilution of ore, and also induced many processes and events the aftereff ects of which were impossible to predict and calculate. With regard to the geological and geotechnical conditions of the deposit, it is proposed to extract the open pit bottom reserves using the room-and-pillar method with backfi lling with the clear sequence. The calculated required strength of the backfill will enable efficient ground control and allow conditions for normal ventilation in the underground mine. According to the calculations, the required strength of the backfill is to be 2.6–4.25 MPa depending on the mining sequence and areas of vertical exposures. Based on the results of investigations into different stages of Maikain deposit mining, various compositions are recommended to make backfills. The authors recommend making fillers using local materials (dry tailings of flotation, screenings of crushing and classifying, separately or mixed), and binders, as per experimental results, can be mixtures of cement and cement-and-lime material with the lime shipped from an open pit mine located close to Maikain Mine.

keywords Maikain complex deposit, hybrid mining method, open pit bottom reserves, complete extraction, solidifying backfill, backfill mixture strength, backfill composition
References

1. Grigorev V. V. Substantiation of mining systems for near-edge reserves of pyrite deposits during the design of combined geotechnology : dissertation ... of Candidate of Engineering Sciences. Magnitogorsk, 2010. pp. 79–83.
2. Tsygalov M. N., Kalmykov V. N., Rylnikova M. V. Geomechanical and technological peculiarities of ore mining in the pit edges' protecting pillars. Gornyi Zhurnal. 1986. No. 5. pp. 24–27.
3. Tsygalov Yu. M. Investigation of solid stowing for mining of near-edge pit reserves : thesis of inauguration of dissertation ... of Candidate of Engineering Sciences. Magnitogorsk, 1982. 155 p.
4. Chernykh A. D., Bryukhovetskiy O. S., Loginskiy A. P. Final processing of ore reserves over the pit edges with goaf stowing. Itogi nauki i tekhniki. Razrabotka mestorozhdeniy tverdykh poleznykh iskopaemykh. Moscow : VINITI AN SSSR, 1987. Vol. 43. pp. 3–12.
5. Bitimbaev M. Zh., Krupnik L. A., Shaposhnik Yu. A. Theory and practice of stowing operations during mineral deposits mining. Gornyy zhurnal Kazakhstana. 2012. No. 5. pp. 19–25.
6. Kravchenko V. T., Smelyanskiy E. S., Paliy V. D., Trofi mov I. M. Guidance for defi nition of characteristic strength of solid stowing on non-ferrous metal mines. Saint Petersburg : VNIMI, 1993. 38 p.
7. Edilbaev A. I., Muzgina V. S. Complex use of solid wastes and local materials in stowing technology. Almaty : Natsionalnyy tsentr po kompleksnoy pererabotke mineralnogo syrya Respubliki Kazakhstan, 2002. pp. 142–145.
8. Krupnik L. A., Yusupov Kh. A., Kabetenov T. K., Myrzakhmetov S. S. Technology and mechanization of stowing operations during the inclined deposits mining. Gornyy zhurnal Kazakhstana. 2013. No. 11. pp. 8–11.
9. Yao Y., Cui Z., Wu R. Development and Challenges on Mining Backfi ll Technology. Journal of Material Science Research. 2012. Vol. 1, Iss. 4. pp. 73–78.
10. Emad M. Z., Vennes I., Mitri H., Kelly C. Backfill Practices for Sublevel Stoping System. Mine Planning and Equipment Selection Chapter : Proceedings of the 22nd MPES Conference, 14th – 19th October 2013. Switzerland : Springer International Publishing, 2014. pp. 391–402.
11. Konstantinova S. A., Chernopazov S. A. Mathematical modeling of deformation mode of rock and artificial massifs with layer chamber mining of pit reserves of "Internatsionalnaya" kimberlite pipe. Fiziko-tekhnicheskie problemy razrabotki poleznykh iskopaemykh. 2005. No. 3. pp. 26–37.
12. O'Sullivan D., Newman A. Extraction and Backfill Scheduling in a Complex Underground Mine. Interfaces. 2014. Vol. 44, No. 2. pp. 204–221.
13. Kaplunov D. R., Rylnikova M. V. Combined mining of ore deposits. Moscow : Gornaya kniga, 2012. 344 p.
14. Azelkhanov A. Zh., Alibaev Zh. O., Zateeva S. M., Alibaev A. O. Technology of stowing operations on the "Suzdalskiy" mine. Gornyy zhurnal Kazakhstana. 2012. No. 7. pp. 24–26.
15. Lyakhov D. P. Technology of cast solid stowing manufacturing from production wastes. Underground mining : materials of International scientific conference : 15–25 April 2015. Krasnoyarsk : Sibirskiy federalnyy universitet, 2015. pp. 34–36.
16. Sheshpari M. A Review of Underground Mine Backfilling Methods with Emphasis on Cemented Paste Backfill. Electronic Journal of Geotechnical Engineering. 2015. Vol. 20, No. 13. pp. 5183–5208.

Language of full-text russian
Full content Buy
Back