DEVELOPMENT OF DEPOSITS
ArticleName Pilot test results of technology with widening stopes in mining thin gently dipping and sheetlike ore bodies
DOI 10.17580/gzh.2019.01.08
ArticleAuthor Lizunkin V. M., Lizunkin M. V., Rabolt A. N., Gurov S. G.
ArticleAuthorData

Transbaikal State University, Chita, Russia:

V. M. Lizunkin, Professor, Doctor of Engineering Sciences
M. V. Lizunkin, Associate Professor, Candidate of Engineering Sciences, LMV1972@mail.ru

 

Priargunsky Mining and Chemical Works (PMCW), Krasnokamensk, Russia:
A. N. Rabolt, Director of Mine No. 8
S. G. Gurov, Chief Engineer of Mine No. 8

Abstract

Currently, Mine No. 8 of PMCW develops Malo-Tulkuevskoe deposit represented by all morphological ty pes of ore bodies: steeply dipp ing, gently dipping lodes, vein-like and complex-structure bodies. Mining of gently dipping sheetlike ore bodies uses the cut-and-fill method characterized by high ore dilution (to 38 %) and considerable expenditures connected with backfill operations (up to 30–40 %) of the cost of stoping). In this connection, the present study was focused on improvement of mining technology for gently dipping ore bodies towards reduction in ore dilution and backfill cost. Having analyzed international experience of underground mining, the authors proposed a variant of mining gently dipping sheetlike ore bodies by wider stopes. The stopes in an ore layer were arranged so that a pillar between them was 3–4 m wide. After extraction of ore from the stopes, additional breakage was carried out along the stope boundaries to a depth of 1.5–2 m into the ore pillar. This technology reduces amounts of drilling, charging and blasting in gangue, haulage costs, hydrometallurgical processing expenses, amount of backfilling, as well as ore loss and dilution; as a consequence, uranium production cost is cut down. The proposed technology for mining gently dipping sheetlike ore bodies with widening stopes was introduced in extraction blocks 8–614 and 8–624.

keywords Thin gently dipping and sheetlike ore bodies, cut-and-fill mining, primary stope, secondary stope, dilutions, widening stope, ore perimeter breakage, additional breakage depth
References

1. Ishchukova L. P., Igoshin Yu. A., Avdeev B. V., Gubkin G. N., Filipchenko Yu. A. et al. Geology of Urulyungui ore province and Streltsov molybdenum–uranium ore field. Moscow : Geoinformmark, 1998. 524 p.
2. Trubetskoy K. N., Galchenko Yu. P., Shuklin A. S. High-efficiency geotechnology for integrated development of flat and inclined lodes. Gornyi Zhurnal. 2018. No. 2. pp. 73–77. DOI: 10.17580/gzh.2018.02.10
3. Ledwaba P. F. The status of artisanal and small-scale mining sector in South Africa: tracking progress. Journal of the Southern African Institute of Mining and Metallurgy. 2017. Vol. 117, Iss. 1. pp. 33–40.
4. Malatse M., Ndlovu S. The viability of using the Witwatersrand gold mine tailings for brickmaking. Journal of The Southern African Institute of Mining and Metallurgy. 2015. Vol. 115, Iss. 4. pp. 321–327.
5. Sebutsoe T. C., Musingwini C. Characterizing a mining production system for decision-making purposes in a platinum mine. Journal of The Southern African Institute of Mining and Metallurgy. 2017. Vol. 117, Iss. 2. pp. 199–206.
6. Li J.-G., Zhan K. Intelligent Mining Technology for an Underground Metal Mine Based on Unmanned Equipment. Engineering. 2018. Vol. 4, Iss. 3. pp. 381–391.
7. Xia K., Chen C., Deng Y., Xiao G., Zheng Y. et al. In situ monitoring and analysis of the mining-induced deep ground movement in a metal mine. International Journal of Rock Mechanics and Mining Sciences. 2018. Vol. 109. pp. 32–51.
8. Shurygin S. V., Morozov A. A., Lizunkin V. M., Lizunkin M. V., Beidin A. V. Integrated geo-technology for mining low-grade economic uranium ore. Underground Ore Mining Technologies. Moscow : Gornaya kniga, 2014. pp. 15–28.
9. Lizunkin V. M., Shurygin S. V., Lizunkin M. V. The results of ore breaking tests by parallel-contiguous blasts at uranium ore breaking in the Streltsovsky ore deposit. GIAB. 2015. No. 4. pp. 41–50.
10. Lizunkin M. V. Experiment of longhole stoping of thin uranium ore deposit. GIAB. 2015. No. 10. pp. 23–26.
11. Trubetskoj K. N., Galchenko J. P., Sabjanin G. V., Shuklin A. S. Method for underground development of sloping and inclined ore bodies of low and medium intensity. Patent RF, No. 2441163. Applied: 07.07.2010. Published: 27.01.2012. Bulletin No. 3.
12. Pavlov A. M. Improvement of underground mining technology for thin inclined gold veins in Irokinda mine. Gornyi Zhurnal. 2008. No. 4. pp. 73–75.
13. Belin V. A., Gorbonoc M. G., Mangush S. K., Ekvist B. V. New blasting technologies. GIAB. 2015. Special Issue 1. Miner’s Week–2015: International Symposium Proceedings. pp. 87–101.