Название |
Assessment of destressing drilling efficiency using numerical methods: A case-study of Oktyabrsky deposit |
Информация об авторе |
NorNickel’s Polar Division, Norilsk, Russia:
M. P. Sergunin, Head of Department for Geotechnical Supervision of Mining at the Center for Geodynamic Safety, SerguninMP@nornik.ru T. P. Darbinyan, Director of Mining Practice Department T. S. Mushtekenov, Deputy Director of Mineral Resources and Reserves V. V. Balandin, Director of Oktyabrsky Mine |
Реферат |
Mineral mining in rockburst-hazardous conditions should involve various precautions in compliance with federal regulations and standards. One of the main methods to prevent rock bursts is destressing drilling. In this method, a yielding zone is artificially created. The strength and deformation characteristics in this zone differ from the same characteristics of enclosing rock mass, and redistribution of stresses takes place as a result. Efficiency of destressing drilling is estimated in terms of ore body S-2 in Komsomolsky Mine. The efficiency criterion is selected to be the safety factor of rock mass with and without destressing drilling. Low efficiency of destressing drilling means that this method is readily replaceable by the other techniques of lesser labor input, for example, by reduction in the rate of mining, or by seasoning of underground excavations for some time required for redistribution of stresses to take place. Based on the theoretical research and the conclusions drawn at NorNickel’s Polar Division, the full-scale tests are scheduled for the implementation in order to gradually abandon destessing drilling in rockburst-hazardous Talnakh and Oktyabrsky ore fields. The authors appreciate participation of V. P. Marysyuk from NorNickel’s Polar Division in this study. |
Библиографический список |
1. Federal Code of Industrial Safety : Safety Regulations for Rockburst-Hazardous Mining. Moscow : NTs PB, 2014. Series 06. Safety, supervision and permission activity in mining industry. Iss. 7. 80 p. 2. Sidlyar A. V., Potapchuk M. I., Tereshkin A. A. Geomechanical confirmation of safe mining at Nikolaevskoye polymetallic deposit, which is rock bursts dangerous. GIAB. 2017. No. 7. pp. 184–194. 3. Hua Jiang, Yang Yang. A three‐dimensional Hoek–Brown failure criterion based on an elliptical Lode dependence. International Journal for Numerical and Analytical Methods in Geomechanics. 2020. Vol. 44, Iss. 18. pp. 2395 –2411. 4. H oek E., Brown E. T. The Hoek–Brown failure criterion and GSI –2018 edition. Journal of Rock Mechanics and Geotechnical Engineering. 2019. Vol. 11, Iss. 3. pp. 445–463. 5. Bertuzzi R. Revisiting rock classification to estimate rock mass properties. Journal of Rock Mechanics and Geotechnical Engineering. 2019. Vol. 11, Iss. 3. pp. 494–510. 6. Fadeev A. B. Finite element method in hydromechanics. Moscow : Nedra, 1987. 221 p. 7. Kuznetsov S. V., Odintsev V. N., Slonim M. E., Trofimov V. A. Strata pressure calculation methodology. Moscow : Nedra, 1981. 104 p. 8. Sidlyar A. V., Potapchuk M. I. Grounding the parameters of rock mass hole discharge in the Nikolayevsky polymetallic deposit dangerous on rock bursts. Problemy nedropolzovaniya. 2017. No. 1(12). pp. 102–110. 9. Sergunin M. P., Alborov A. E., Andreev A. A., Buslova M. A. Stress assessment ahead of stoping front with widening stress relief zone – A case study of the Oktyabrsky and Talnakh deposits. Gornyi Zhurnal. 2020. No. 6. pp. 38–41. DOI: 10.17580/gzh.2020.06.06 10. Eremenko A. A., Darbinyan T. P., Aynbinder I. I., Konurin A. I. Geomechanical assessment of rock mass in the Talnakh and Oktyabrsky deposits. Gornyi Zhurnal. 2020. No. 1. pp. 82–86. DOI: 10.17580/gzh.2020.01.16 11. Uskov V. A., Eremenko A. A., Darbinyan T. P., Marysyuk V. P. Geodynamic hazard assessment for tectonic structures in underground mining of north ore bodies in the Oktyabrsky deposit. Journal of Mining Science. 2019. Vol. 55, Iss. 1. pp. 77–87. 12. Galaov R. B., Kholichev E. A., Nagovitsyn Yu. N., Andreev A. A., Mulev S. N. Geomechanical situation during the cutting at "Bolshoy Gorst" pool (Taimyr mine). Gornyi Zhurnal. 2013. No. 2. pp. 14–20. 13. RS2. Rocscience, 2021. Available at: https://www.rocscience.com/software/rs2 (accessed: 19.11.2020). 14. Kharisov T. F., Kharisova O. D. Study of rock mass stability in process of mining under complex mining and geological conditions. Problemy nedropolzovaniya. 2019. No. 2(21). pp. 79–87. |