Agglomeration and Production of Cast Iron
ArticleName Modernization of the gate drive of the coke breeze bin of the JSC Ural Steel`s blast furnace
DOI 10.17580/chm.2022.03.03
ArticleAuthor O. V. Galochkin, A. V. Nefedov, O. N. Chicheneva
ArticleAuthorData

Novotroitsk Branch of National University of Science and Technology MISIS, Novotroitsk, Russia:

O. V. Galochkin, Student
A. V. Nefedov, Cand. Ped., Associate Professor

 

National University of Science and Technology MISIS, Moscow, Russia:
O. N. Chicheneva, Cand. Eng., Associate Professor, Dept. of Computer-Aided Engineering and Design, e-mail: ch-grafika@mail.ru

Abstract

In the blast furnace shop of JSC «Ural Steel», the supply of material to conveyors for transportation to blast furnaces is directly regulated by valves located under the unloading bins in estrus. When using the existing equipment of coke grinding bins, a significant drawback in their operation is the frequent failure of individual units, due to the long service life and long service life. As a result, there is downtime of the device, as a rule, due to the low reliability of the operating electric drive. In order to reduce the time of equipment repairs that arise primarily due to the wear and tear of obsolete equipment, it is proposed to modernize the valve mechanism of the coke oven hopper, which consists in replacing the existing multi-element drive (electric motor, clutch and gearbox) with a coaxial gear motor, which is an appropriate solution for mechanisms operating in repeated-short-term mode. Additional capital expenditures required to upgrade the coke hopper valve mechanism include the purchase and installation of a geared motor, a gear clutch and the manufacture of a frame for a geared motor. The total capital costs for the purchase of equipment, spare parts, logistics and the cost of dismantling old equipment and installing new equipment does not exceed 120 thousand rubles. As a result of this modernization: the cost of production decreased by 0.228 rubles / ton; profit from sales increased by 0.022%; the payback period of this event is less than 3 months. The project is effective, quickly pays off and can be recommended for implementation not only at JSC «Ural Steel», but also at other metallurgical enterprises of the industry.

keywords Blast furnace production, blast furnace shop, coconut hopper, hopper shutter, electromechanical drive, geared motor
References

1. Rumyantsev M. I. Some approaches to improve the resource efficiency of production of flat rolled steel. CIS Iron and Steel Review. 2016. Vol. 12. pp. 32–36.
2. Dorogin S. V., Ganin D. R. Modernization of the apron feeder 1-15-90A at the Orsk crushed stone plant. Gornyi Zhurnal. 2020. No. 3. pp. 27–33. DOI: 10.17580/gzh.2020.03.11.
3. Koryak А. V., Chichenev N. А. Reengineering of the undercarriage with the container of the electric arc furnace. Stal. 2020. No. 1. pp. 36–39.
4. Efremov D. B., Stepanov V. М., Chicheneva О. N. Modernization of the mechanism for quick spinning of rolls of the DUO rolling stand of 2800 mill of JSC Ural Steel. Stal. 2020. No. 8. pp. 44–47.
5. Krasov К. S., Nefedov А. V., Chichenev N. А. Improvement of the operational reliability of a sheet bending four-roll machine of JSC Ural Steel. Chernye Metally. 2019. No. 12. pp. 66–69.

6. Gorbatyuk S. М., Morozova I. G., Naumova М. G. Development of a working model of the reindustrialization process for the heat treatment production of die steels. Izvestiya vuzov. Chernaya metallurgiya. 2017. Vol. 60. No. 5. pp. 410–415.
7. White paper: Ways to Reduce Unplanned Downtime. Available at: https://www.graco.com/content/dam/graco/ipd/literature/misc/unplanned_downtime/UnplannedDowtimeEN-A.pdf (accessed: 10.09.2021).
8. A Ridiculously Simple Guide To Managing Planned Downtime: Scheduled Downtime. Available at: https://limblecmms.com/blog/planned-downtime/ (accessed: 10.09.2021).
9. Brand P. Downtime in Manufacturing: What’s the True Cost? Available at: https://oden.io/blog/downtime-in-manufacturing-the-true-cost/ (accessed: 10.09.2021).
10. Desmond S. 4 Methods to Reduce Unplanned Downtime in Manufacturing. Available at: https://blog.alchemysystems.com/4-methods-to-reduce-unplanned-downtime-inmanufacturing/ (accessed: 10.09.2021).
11. Chichenev N. A. Reengineering of the Slab-Centering Unit of a Roughing Mill Stand. Metallurgist. 2018. Vol. 62, Iss. 7–8. pp. 701–706.
12. Gorbatyuk S. М., Zarapin А. Yu., Chichenev N. А. Modernization of the vibrating screen of the Katoka mining company (Angola). GIAB. 2018. No. 1. pp. 143–149.
13. Gorbatyuk S. М., Zarapin А. Yu., Chichenev N. А. Reengineering of the spiral classifier of the Katoka Mining Society (Angola). GIAB. 2018. No. 2. pp. 215–221.
14. Arabadzhi Ya. N., Olennikov А. S., Kurchukov А. М., Likhacheva Т. А. Reconstruction of the equipment of the thickening department of the Talnakh concentrator using the HRT technology from Outotec. Tsvetnye Metally. 2018. No. 6. pp. 38–43.
15. Zhareken А. Zh., Dzhumaliev А. S. Burning furnace cooling circuit refitting. Gornyi Zhurnal. 2018. No. 5. pp. 34, 35.
16. Bardovsky A. D., Gerasimova A. A., Basyrov I. I. Constructive solutions for upgrading of the drive of processing equipment. IOP Conference Series: Materials Science and Engineering. 2020. Vol. 709, Iss. 2.
17. Tselikov А. I., Polukhin P. I., Grebenik V. М. et al. Machines and units of metallurgical plants. In 3 volumes. Vol. 1. Machines and units of blast-furnace shops: textbook for universities. Moscow: Metallurgiya, 1988. 440 p.
18. Iron metallurgy: textbook for universities. Edited by Yusfin Yu. S. 3rd edition, revised and enlarged. Moscow: Akademkniga, 2004. 774 p.
19. Kaplun L. I., Malygin А. V., Onorin О. P., Parkhachev А. V. Structure and design of blast furnaces: textbook. Yekaterinburg: UrFU, 2016. 219 p.
20. Blast-furnace and steel-smelting production at JSC Ural Steel. Available at: https://www.bibliofond.ru/view.aspx?id=897676#text (accessed: 26.11.2021).
21. Roller table motors АR43-8 with a power of 0.3 kW and a rotation speed of 250 rpm. Available at: https://nasos-motor.ru/rolgangovye-elektrodvigateli/ar43-8.html (accessed: 26.11.2021).
22. Cylindrical horizontal three-stage reducers of types 1TsZU-160, 1TsZU-200, 1TsZU-250. Available at: https://www.uralreduktor.ru/katalog/standart/68 (accessed: 26.11.2021).
23. Coke breeze. Koks Servis. Available at: http://koks-servis.ru/koksovaya-meloch.html (accessed: 26.11.2021).
24. Gorbatyuk S. М., Ivanov S. А., Kirillova N. L., Chichenev N. А. Engineering of lifting machines and devices: textbook. Moscow: Izdatelskiy dom MISiS, 2017. 279 p.
25. Aleksandrov А. P. Lifting machines: tutorial. Moscow: Izdatelstvo MGTU imeni N. E. Baumana – Vysshaya shkola, 2000. 552 p.
26. Dunaev P. F., Lelikov О. P. Design of units and parts of machines: textbook for universities. Moscow: Izdatelskiy tsentr «Akademkniga», 2008. 496 p.
27. Andrienko L. А., Baykov B. А., Ganulich I. К. et al. Machine Elements: tutorial. Moscow: Izdatelstvo MGTU imeni N. E. Baumana, 2007. 520 p.
28. Gearboxes and gearmotors R, RF. Available at: https://mirprivoda.ru/reduktora-r_rf/ (accessed: 08.11.2021).
29. GOST R 50895–96. Toothed clutches. Specifications. Introduced: 23.04.1996.

Language of full-text russian
Full content Buy