ArticleName |
Quantitative assessment of rock mass stress–strain behavior at Severomuysky Tunnel |
ArticleAuthorData |
Research Center for Applied Geomechanics and Convergent Technologies in Mining, NUST MISIS’ College of Mining, Moscow, Russia:
V. A. Eremenko, Director, Doctor of Engineering Sciences, Professor of the Russian Academy of Sciences, prof.eremenko@gmail.com Ch. V. Khazhyylai, Post-Graduate Student, Project Engineer A. R. Umarov, Project Engineer, Post-Graduate Student
VolksKruppAE, Saint-Petersburg, Russia: D. V. Lagutin, Chief Geologist |
Abstract |
The article presents the selected geotechnical engineering studies accomplished in 2021–2022 by the Research Center for Applied Geomechanics and Convergent Technologies in Mining, College of Mining, NUST MISIS for the reconstruction project of Severomuysky Tunnel (ST) of the Baikal–Amur Mainline. The studies included the quantitative and qualitative geotechnical assessment of rock mass, its stress–strain analysis and susceptibility to rock bursts. Within the rock mass quality rating of ST, using the geological logs on 441 sample boreholes, the lab-scale test data on the physical and mechanical properties of 1820 rock samples were processed. The average values of the rock mass quality rating are presented for three geotechnical elements. The stress–strain analysis of ST rock mass and the lab-scale tests of rock brittleness made it possible to detect sites susceptible to rock bursts along the transportation tunnel, and to develop appropriate geotechnical monitoring activities. The recommendations are given to implement the described geotechnical surveys in construction and reconstruction of analogous objects and facilities, and in solid mineral mining.
The geotechnical research and other operations were carried out under guidance of RSRS GmbH Railway Infrastructure Projects CEO E. V. Dorot and the Company’s experts. The authors appreciate participation of the Project Engineers of the Research Center for Applied Geomechanics and Convergent Technologies in Mining, College of Mining, NUST MISIS N. G. Vysotin, A. M. Yanbekov, M. A. Kosyreva and S. S. Shermatova. |
References |
1. Kurtsev B. V., Fedotov G. S. MICROMINE-based geomechanical supervision of mining. Gornyi Zhurnal. 2022. No. 1. pp. 45–50. DOI: 10.17580/gzh.2022.01.08 2. Heriyadi B., Prengki I., Prabowo H. Analysis of Collapse Load and Open Hole Evaluation Based on Rock Mass Ratting (RMR) Method in Underground Mining. Journal of Physics: Conference Series. 2019. Vol. 1387. 012104. DOI: 10.1088/1742-6596/1387/1/012104 3. Barton N. Application of Q-system and index tests to estimate shear strength and deformability of rock masses. Workshop on Norwegian Method of Tunneling. New Delhi, 1993. pp. 66–84. 4. Barton N., Lien R., Lunde J. Engineering classification of rock masses for the design of tunnel support. Rock Mechanics. 1974. Vol. 6, Iss. 4. pp. 189–236. 5. Bieniawski Z. T. Classification of Rock Masses for Engineering: The RMR System and Future Trends. Comprehensive Rock Engineering: Principles, Practice and Projects. Oxford : Pergamon Press, 1993. Vol. 3. Rock Testing and Site Characterization. pp. 553–573. 6. Jian-yun Lin, Yu-jun Zuo, Jian Wang, Lu-jing Zheng, Bin Chen et al. Stability analysis of underground surrounding rock mass based on block theory. Journal of Central South University. 2020. Vol. 27, Iss. 10. pp. 3040–3052. 7. Pereira F. C., Lima T., Chaves S. S., Vilca Y. C., Canabrava L. P. Stability analysis of free span in excavations with diameter greater than 10 meters—Study case in the córrego do sítio mine. Rock Mechanics for Natural Resources and Infrastructure Development–Full Papers : Proceedings of the 14th International Congress on Rock Mechanics and Rock Engineering. Ser. Proceedings in Earth and Geosciences. London : CRC Press, 2020. Vol. 6. pp. 878–883. 8. Khazhyylay Ch. V., Eremenko V. A., Kosyreva M. A., Yanbekov A. M. In-situ rock mass failure envelope plotting using the Hoek–Brown criterion and RocData software toolkit. GIAB. 2018. No. 12. pp. 92–101. 9. Eremenko V. A., Vinnikov V. A., Kosyreva M. A., Lagutin D. V. Identification of rock jointing parameters by borehole imaging and interval geotechnical documentation of non-oriented drill cores. Gornyi Zhurnal. 2022. No. 1. pp. 21–26. DOI: 10.17580/gzh.2022.01.04 10. Kosyreva M. A., Eremenko V. A., Gorbunova N. N., Tereshin A. A. Support design using Unwedge software for mines of Nornickel’s Polar Division. GIAB. 2019. No. 8. pp. 57–64. 11. Hoek E., Carter T. G., Diederichs M. S. Quantification of the Geological Strength Index Chart. 47th U.S. Rock Mechanics/Geomechanics Symposium. San Francisco, 2013. 12. Hoek E., Martin C. D. Fracture initiation and propagation in intact rock—A review. Journal of Rock Mechanics and Geotechnical Engineering. 2014. Vol. 6, Iss. 4. pp. 287–300. 13. Eremenko V. A., Ainbinder I. I., Marysyuk V. P., Nagovitsyn Yu. N. Guidelines for selecting ground support system for the Talnakh operations based on the rock mass quality assessment. Gornyi Zhurnal. 2018. No. 10. pp. 101–106. DOI: 10.17580/gzh.2018.10.18 14. Neugomonov S. S., Volkov P. V., Zhirnov A. A. Tunnel support in weak rocks using self-fastening rock bolts SZA. Gornyi Zhurnal. 2018. No. 2. pp. 31–34. DOI: 10.17580/gzh.2018.02.04 15. Zubkov A. A., Latkin V. V., Neugomonov S. S., Volkov P. V. Prospective methods of support of mine excavations at underground mines. Conditions of Stable Functioning of Mineral Resource Complex of Russia. Moscow : Gornaya kniga, 2014. Iss. 1. pp. 106–117. 16. Kalmykov V. N., Volkov P. V., Latkin V. V. Substantiation of grouted rock bolting design for full-scale tests in Safianovsky mine. Aktualnye problemy gornogo dela. 2016. No. 2. pp. 27–35. 17. Kalmykov V. N., Latkin V. V., Zubkov A. A., Neygomonov S. S., Volkov P. V. The feature of construction increased combined fix on underground mines. GIAB. 2015. Iss. 3. Conditions of stable functioning of mineral-resource complex of Russia. Special issue 15. pp. 63–69. 18. Lushnikov V. N., Sandy M. P., Eremenko V. A., Kovalenko A. A., Ivanov I. A. Method of definition of the zone of rock massif failure range around mine workings and chambers by numerical modeling. Gornyi Zhurnal. 2013. No. 12. pp. 11–16. |