Journals →  Chernye Metally →  2009 →  #2 →  Back

ArticleName Rational approach for using the resources of multi-range production
ArticleAuthor A. G. D'yachko, E. A. Kalashnikov, Z. S. Sunatova.
Abstract Possibility of usage of “Arena” system for imitating simulation for multi-resource and multi-range production at a metallurgical enterprise has been investigated in order to solve consequently the problem of managing intra-shop flows for compensation of arising different external fluctuations. The analysis of simulation results undertaken on the base of 2002 data from Nizhny Tagil metallurgical works has displayed their good correspondence with the work data. Changes of material flows at the main production facilities of the works, as a result of occurring different hazardous situations, are analyzed.
keywords resources, metallurgical enterprises, computer-aided simulation, material flows, production facilities, shops, hazardous situation, multi%range production.
References 1. Дьячко A. Г. Математическое и имитационное моделирование производственных систем. — М.: МИСиС, 2007. — 540 с.
2. Носов C. K. Методические основы эффективного управления металлургическим комплексом в современных экономических условиях. Дис. ... д-ра техн. наук. — М.: МИСиС, 2003. — 462 с.
3. Ро Тэ Кюн, Дьячко А. Г., Смирнов O. M. Методика динамического моделирования предприятий бизнеса и инновационных проектов по их модернизации // Автоматизация в промышленности. 2007. №3. С. 15–19.
4. Po Тэ Кюн. Динамическое моделирование предприятий бизнеса на инновационной предпроектной стадии в целях прогнозирования: Дис. ... д-ра техн. наук. — М.: МИСиС, 2007. — 192 с.
Language of full-text russian
Full content Buy
Back