Journals →  Gornyi Zhurnal →  2011 →  #8 →  Back

THEORY AND PRACTICE OF PRODUCTION
Physics and mechanics of mining rocks
ArticleName Optimization of mining operations on the example of the Maikubensky strip mine
ArticleAuthor Rakishev B. R., Moldabaev S. K., Shulaeva N. A.
ArticleAuthorData Rakishev B. R., Head of Department, Professor, Doctor of Engineering Sciences, Member of the NAS of the Republic of Kazakhstan (K. I. Satpaev Kazakhstan National Technical University), e-mail: b.rakishev@mail.ru; Moldabaev B. R., Technical Consultant, Professor, Doctor of Engineering Sciences, e-mail: moldabaev_s_k@mail.ru, Shulaeva N. A., Director on Labour Protection and Ecology (Maikuben-West Ltd.), e-mail: fshulaeva@mail.ru
Abstract

On the example of the Maikubensky strip mine (Kazakhstan) it is presented the developed by the authors a multi-criteria mathematical model of overburden removal optimization (minimization) and time schedule of the open-pit development by automated distribution of coal mining volumes between blocks and units of the open-pit field.

keywords Inclined-flat coal seams, open-pit field, units, blocks, time schedule of development, optimization of overburden removal current and average coefficients, volume sharing, mathematical model.
Language of full-text russian
Full content Buy
Back